Flood level analysis for proposed building construction. JW Harding
Material type: TextPublication details: MB : 1990Online resources: Abstract: A hydrology review was carried out for the Oak Hammock Marsh by the Stonewall staff. The mandate was to determine the 1:100 year event (1%)flood level as it relates to the new DU building complex adjacent to the existing Cell 2.Item type | Current library | Collection | Call number | Status | Date due | Barcode |
---|---|---|---|---|---|---|
Electronic Report | Electronic Library | Non-fiction | HAR (Browse shelf(Opens below)) | Available | 1041 |
Browsing Electronic Library shelves Close shelf browser (Hides shelf browser)
CD# 2 file HAR003.PDF
A hydrology review was carried out for the Oak Hammock Marsh by the Stonewall staff. The mandate was to determine the 1:100 year event (1%)flood level as it relates to the new DU building complex adjacent to the existing Cell 2.