Image from Google Jackets

Flood level analysis for proposed building construction. JW Harding

By: Material type: TextTextPublication details: MB : 1990Online resources: Abstract: A hydrology review was carried out for the Oak Hammock Marsh by the Stonewall staff. The mandate was to determine the 1:100 year event (1%)flood level as it relates to the new DU building complex adjacent to the existing Cell 2.
Holdings
Item type Current library Collection Call number Status Date due Barcode
Electronic Report Electronic Report Electronic Library Non-fiction HAR (Browse shelf(Opens below)) Available 1041

CD# 2 file HAR003.PDF

A hydrology review was carried out for the Oak Hammock Marsh by the Stonewall staff. The mandate was to determine the 1:100 year event (1%)flood level as it relates to the new DU building complex adjacent to the existing Cell 2.

Ducks Unlimited Canada Institute for Wetland & Waterfowl (IWWR) Research Library, P.O. Box 1160, Stonewall, MB R0C 2Z0
(204)467-3276|Fax (204) 467-9028|