Image from Google Jackets

Completed projects evaluation progress report : R.T. Clay. floodplain and inland New Brunswick biomes /

By: Contributor(s): Material type: TextTextPublication details: 1985-86.Description: 2 v. (various pagings) : ill. ; 28 cmOnline resources: Abstract: In 1985, Ducks Unlimited Canada continued a Completed Projects Evaluation (CPE) study of five marshes on the inland area (INNB) and five marshes in floodplain habitat (FLNB) in New Brunswick. The study,begun in 1984, was originally planned to run three years, with objectives to determine densities of breeding ducks and duck broods,describe the habitats in and surrounding the marshes to facilitate comparison with other undeveloped areas, and investigate relationships between breeding ducks and the habitat.

CD# 1 file CLA004.PDF

Includes bibliographical references.

In 1985, Ducks Unlimited Canada continued a Completed Projects Evaluation (CPE) study of five marshes on the inland area (INNB) and five marshes in floodplain habitat (FLNB) in New Brunswick. The study,begun in 1984, was originally planned to run three years, with objectives to determine densities of breeding ducks and duck broods,describe the habitats in and surrounding the marshes to facilitate comparison with other undeveloped areas, and investigate relationships between breeding ducks and the habitat.

Ducks Unlimited Canada Institute for Wetland & Waterfowl (IWWR) Research Library, P.O. Box 1160, Stonewall, MB R0C 2Z0
(204)467-3276|Fax (204) 467-9028|