Completed projects evaluation progress report : R.T. Clay. floodplain and inland New Brunswick biomes /
Material type: TextPublication details: 1985-86.Description: 2 v. (various pagings) : ill. ; 28 cmOnline resources: Abstract: In 1985, Ducks Unlimited Canada continued a Completed Projects Evaluation (CPE) study of five marshes on the inland area (INNB) and five marshes in floodplain habitat (FLNB) in New Brunswick. The study,begun in 1984, was originally planned to run three years, with objectives to determine densities of breeding ducks and duck broods,describe the habitats in and surrounding the marshes to facilitate comparison with other undeveloped areas, and investigate relationships between breeding ducks and the habitat.Item type | Current library | Collection | Call number | Status | Notes | Date due | Barcode |
---|---|---|---|---|---|---|---|
Electronic Report | Electronic Library | Non-fiction | NEL (Browse shelf(Opens below)) | Available | 1984 Progress Report | 15658 | |
Electronic Report | Electronic Library | Non-fiction | CLA (Browse shelf(Opens below)) | Available | 1985 Progress Report | 838 |
CD# 1 file CLA004.PDF
Includes bibliographical references.
In 1985, Ducks Unlimited Canada continued a Completed Projects Evaluation (CPE) study of five marshes on the inland area (INNB) and five marshes in floodplain habitat (FLNB) in New Brunswick. The study,begun in 1984, was originally planned to run three years, with objectives to determine densities of breeding ducks and duck broods,describe the habitats in and surrounding the marshes to facilitate comparison with other undeveloped areas, and investigate relationships between breeding ducks and the habitat.