Preliminary engineering report: a multi-use development proposal for the Deadfish drainage system / Ducks Unlimited Canada.
Material type: TextPublication details: Edmonton, AB : Ducks Unlimited (Canada), 1981.Description: ii, 20 [3] p. : ill., map in pocket ; 28 cmSummary: This preliminary engineering report was written to indicate the feasibility and development potential in the Deadfish drainage by Ducks Unlimited. These preliminary investigations indicate that the water demands for the proposed habitat development would require approximately 6400 ac-ft. of water to initially fill all of the management units. To replenish evaporative losses in subsequent years,an estimated 3500 ac-ft of water would be required.Item type | Current library | Collection | Call number | Status | Date due | Barcode |
---|---|---|---|---|---|---|
Book | Edmonton Office Stacks | Non-fiction | DU 147 (Browse shelf(Opens below)) | Available | 9258 |
Browsing Edmonton Office shelves, Shelving location: Stacks Close shelf browser (Hides shelf browser)
This preliminary engineering report was written to indicate the feasibility and development potential in the Deadfish drainage by Ducks Unlimited. These preliminary investigations indicate that the water demands for the proposed habitat development would require approximately 6400 ac-ft. of water to initially fill all of the management units. To replenish evaporative losses in subsequent years,an estimated 3500 ac-ft of water would be required.