Progress report #3 : a summary of work completed during the extra Ribstone circuit for breeding pairs, and during survey circuits 5 and 6 for broods, and other associated work on the Ribstone Backflood Irrigation Project, Alberta. IEC Beak Consultants Ltd.
Material type: TextPublication details: Calgary, AB : IEC Beak Consultants Ltd., 1983.Description: ii, 17 p. ; 28 cmOnline resources: Summary: This report summarizes the work completed during survey circuits 5 and 6 (4 July through to 27 July 1983) for the central Alberta parkland region. The report includes a summary of work accomplished during the waterfowl brood surveys, the within-basin emergent and submergent vegetation mapping, a summary of general waterfowl activity and a section outlining the anticipated work and scheduling for the final survey circuit.Item type | Current library | Collection | Call number | Status | Date due | Barcode |
---|---|---|---|---|---|---|
Electronic Report | Electronic Library | Non-fiction | IEC (Browse shelf(Opens below)) | Available | 9252 |
Browsing Electronic Library shelves Close shelf browser (Hides shelf browser)
Includes bibliographical references (p. 17).
This report summarizes the work completed during survey circuits 5 and 6 (4 July through to 27 July 1983) for the central Alberta parkland region. The report includes a summary of work accomplished during the waterfowl brood surveys, the within-basin emergent and submergent vegetation mapping, a summary of general waterfowl activity and a section outlining the anticipated work and scheduling for the final survey circuit.