Swan Lake control structure : 1976 /
Material type: TextPublication details: [Winnipeg] : Manitoba. Dept. of Mines, Resources and Environmental Management, Water Resources Division, 1976?Description: various pagination ; ill. ; 28 cmSummary: Instructions to Bidders; Tender Form; Bid Bond; Contract; Performance Bond; Labour and Material Payment Bond; Notice of Labour and Material Payment Bond; Special Provisions; Contractor's Schedule of Work;General specifications.Item type | Current library | Collection | Call number | Status | Date due | Barcode |
---|---|---|---|---|---|---|
Book | Research Library Government Documents | Non-fiction | CA2 MB CON WR 1976-4 (Browse shelf(Opens below)) | Available | 8283 |
Browsing Research Library shelves, Shelving location: Government Documents Close shelf browser (Hides shelf browser)
No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | ||
CA2 MB CON WR 1976-1 Groundwater resources in the Souris basin in Manitoba. | CA2 MB CON WR 1976-2 Portage diversion proposed modifications to reach 1A. | CA2 MB CON WR 1976-3 Delta Marsh project centre unit engineering study. | CA2 MB CON WR 1976-4 Swan Lake control structure : 1976 / | CA2 MB CON WR 1977-1 A review of agricultural drainage in Manitoba. | CA2 MB CON WR 1977-2 Lower Whitemud River and Big Grass Marsh flood control study: phase 1 | CA2 MB CON WR 1977-3 The Lake Winnipeg shoreline handbook : a property owner's guide to shoreline processes and erosion protection structures on the southern pool of Lake Winnipeg / |
Project No. W.C.C. 545, Tender No. 11
Instructions to Bidders; Tender Form; Bid Bond; Contract; Performance Bond; Labour and Material Payment Bond; Notice of Labour and Material Payment Bond; Special Provisions; Contractor's Schedule of Work;General specifications.