Image from Google Jackets

Pre and post construction studies at Salt Flats : Donald A. Sexton. preliminary report /

By: Material type: TextTextPublication details: Dauphin, MB : 1981. Ducks Unlimited Canada,Description: 25 p. : ill. , map ; 28 cmOnline resources: Abstract: Pre and post construction studies were carried out on the Salt Flats project during 1979 through 1981. Waterfowl use during the three years showed no trend or changes with regard to breeding pairs or broods.Invertebrate sampling and water quality tests were inconclusive and showed no changes at pre versus post construction periods. Plant transect results indicated that saline tolerant species were dominant throughout the sampling period. The significance of post development water levels on the above factors is discussed.

Includes bibliographical references (p.23).

Pre and post construction studies were carried out on the Salt Flats project during 1979 through 1981. Waterfowl use during the three years showed no trend or changes with regard to breeding pairs or broods.Invertebrate sampling and water quality tests were inconclusive and showed no changes at pre versus post construction periods. Plant transect results indicated that saline tolerant species were dominant throughout the sampling period. The significance of post development water levels on the above factors is discussed.

Ducks Unlimited Canada Institute for Wetland & Waterfowl (IWWR) Research Library, P.O. Box 1160, Stonewall, MB R0C 2Z0
(204)467-3276|Fax (204) 467-9028|