Summerberry marsh complex final report on direct cost and construction analysis. JR Champagne
Material type: TextPublication details: Manitoba : 1982Online resources: Abstract: This report will cover Direct and Indirect Cost Analysis. An analysis of the construction work with working schedules. Construction methods with their technical difficulties and recommenations. A miscellaneous section covering winter roads, rock & gravel haul, winter river crossing and D.U. equipment used.Item type | Current library | Collection | Call number | Status | Date due | Barcode |
---|---|---|---|---|---|---|
Electronic Report | Electronic Library | Non-fiction | CHA (Browse shelf(Opens below)) | Available | 818 |
Browsing Electronic Library shelves Close shelf browser (Hides shelf browser)
CD# 1 file CHA004.PDF
This report will cover Direct and Indirect Cost Analysis. An analysis of the construction work with working schedules. Construction methods with their technical difficulties and recommenations. A miscellaneous section covering winter roads, rock & gravel haul, winter river crossing and D.U. equipment used.